1 week ago
Thursday, April 8, 2010
We have electricity!
Today I finished digging the trench for the electrical conduit while my dad moved bricks. I then cut and glued it all the way out. After my dad left, I filled in the little ditch all the way. This is 1 ¼” pvc conduit for the future electrical service line to the garage that may be built someday. A lot of work for maybe; right? Well, the ditch is dug, and the pipe is reasonable. So one pipe down, two to go?
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment