Thursday, April 8, 2010

We have electricity!


Today I finished digging the trench for the electrical conduit while my dad moved bricks. I then cut and glued it all the way out. After my dad left, I filled in the little ditch all the way. This is 1 ¼” pvc conduit for the future electrical service line to the garage that may be built someday. A lot of work for maybe; right? Well, the ditch is dug, and the pipe is reasonable. So one pipe down, two to go?

No comments:

Post a Comment